Free on-site measure and material samples brought to your yard.
Get a Quote4.8
142 Google reviews
600+
Fence runs and decks built
5 yrs
Structural workmanship warranty
The proof
Before & after.
Old leaning fence and grey deck replaced with cedar panels and a stained, re-framed deck.
Materials, compared
Cost and lifespan, before you pick one.
Plan → build
Measured before it's cut.
We mark the line, check grade, and locate utilities.
Gate hardware
double-gate entry · Millbrook
Finished backyard
fence & deck combo · Riverside
Stair detail
railing and stringers · Stonegate
Recent work
Material samples.
cedar vs. composite · on-site consult
The offer
Don't pick your material from a screen.
Free on-site measure and material samples brought to your yard.
“They helped us pick materials that actually fit our budget, not just the priciest option.”
L. Petrova
Homeowner
“Brought actual cedar and composite samples to our yard instead of a brochure. Made the decision easy.”
W. Bergstrom
Deck build client
“Property line survey caught an issue our neighbor's old fence had ignored for years. Handled it professionally.”
C. Iwu
Privacy fence client
Ballpark estimator
Price my project.
STEP 1 — WHAT ARE WE BUILDING?
STEP 2 — LINEAR FEET
STEP 3 — MATERIAL
ESTIMATED RANGE
$5,040–$6,240
15–20 yrs · restain every 2–3 yrs
A starting estimate from our published per-linear-foot rates. A free on-site measure gives you an exact number.
How a build runs
No guesswork, start to finish.
On-site measure
We mark the line, check grade, and locate utilities.
Material walkthrough
Cedar, pressure-treated, or composite — priced side by side.
Permit & schedule
We file with the municipality and book your build week.
Build & cleanup
Posts set in concrete, boards fastened, site raked clean.
Typical pricing
Real numbers, before you ask.
Service area: Residential fencing and decks within 45 minutes of the yard, spring through late fall.
Privacy fence
from $52 / linear ft
- 6 ft cedar or PT
- Posts set in concrete
- Gates & hardware
Financing available on approved credit — ask when you request your estimate.
Questions people actually ask
Answered up front.
Do you handle permits and property lines?
Yes. We pull permits and confirm the line with your survey before digging.
How deep are posts set?
Below frost line, in concrete, with gravel drainage at the base.
Cedar or composite?
Cedar costs less up front; composite costs more and needs almost no upkeep. We price both.
How long does a job take?
Most fence runs take two days; decks take three to five.








